High level platform

Description: Stewarts Park Valve Chambers
Client: JN Bentley
Date: March 2011
Discipline: Mechanical Fabrication
Value: £20,000

Intelect were contracted by JN Bentley to design, fabricate and install high-level platform around a compact 1m diameter valves due to NWL operatives having to climb over valves in the chamber which was causing health and safety issues.

The platforms were constructed in mild steel channel and angle in our workshop, from here they were taken to site fitted in black form and removed to be galvanised and then refitted on the underground chambers.

We were given 3 months to construct 3 platforms which was completed to the desired timeframe. The client was pleased with the quality and rapid turn around and consequently further similar and further projects to reduce health and safety hazards have been awarded.