Mosswood Hydraulic Actuator Replacement

Description: Mosswood Hydraulic Actuator Replacement
Client: JN Bentley
Date: Jul 2012 – Oct 2012
Discipline: Mechanical
Value: £43,000

Intelect UK Ltd were contracted by JN Bentley to replace the existing 48 No. hydraulic actuators on the rapid gravity filters at Northumbrian Water Mosswood WTW. This involved decommissioning the existing system, including pipework and installing new Auma electric actuators onto the existing washout, air scour, filter inlet & filter outlet valves.

The above mechanical works were integrated with another subcontractor undertaking the electrical works, all works being sequenced across 12 No. Rapid gravity filters maintaining operation of the works throughout the projects. All works completed on time & within budget to the complete satisfaction of the client JN Bentley 

JN Bentley is one of our major NWL clients over the last 6 years and continues to award us framework projects. We have worked on many projects ranging from small pumping stations refurbishments to new sludge dewatering installations.

Posted in Case Studies, News and tagged , .