Platform build for Burts Crisps

Intelect were contracted by Burts Chips in Plymouth, to undertake the design, fabrication and installation of their phase 1 mezzanine floor to be installed in their new packaging area.

Our CAD department carried out all the design work for the platform, all fabrication and welding work was carried out in-house to BSEN 1090. On completion of the fabrication process, the platform was then disassembled and transported to Plymouth where we installed the platform and the necessary electrical installations.

Posted in Case Studies, News and tagged , , , , , .