Teabag Machine Control Panel

Client: Tetley Tea
Date: 2007/2008
Discipline: Panel Manufacturing
Value: £100,000

During 2007/2008 Intelect UK Ltd Panel department completed the project to overhaul a Teabag manufacturing machine at Tetley Tea, Eaglescliffe.

The project required a full mechanical and electrical overhaul which was project managed by our Panel Department.

On completion of the site installation of the new control panel and machine overhaul the machine was EMC tested and fully commissioned on-site by our Engineering team.