Mezzanine storage platforms

Client Name:

Britvic

Discipline:

Mechanical Design / Mechanical Fabrication / Mechanical Installation

Intelect were contracted Britvic to undertake the design, fabrication and installation of a number of new mezzanines and gantries for their site in London.

This mezzanine was listed as number 1 and was free standing in the new section of the factory. In total, it took six weeks to fabricate the platform, all of which was done in our state-of-the-art workshop. The platform was then transferred to the clients site where it took two weeks to install, with approximately 20 personnel being involved in the entire process.