Intelect were contracted by GE Energy to supply, manufacture and install a 200KW Drive Control Panel, to replace existing obsolete equipment on site at Tata Steel, Corby.
In order to minimise disruption to the client, the panels were deigned and arranged around existing cabling to complement the structure of the site.
A coordinated team of seven skilled engineers were involved at multiple stages throughout this project, both in-house and on the client’s site, ensuring that the client was supported at every stage of the process.
Works were carried out over a shutdown period of 4 days, to suit the client’s production agenda. Commissioning was completed ahead of schedule, and within budget, ensuring maximum efficiency.
Project Information
Corby Roller Table 200KW Replacement Drives
Client: GE Energy
Sector: Heavy Industry
Value: £80,000