Case Study : 800AMP LV Distribution Switchboard

Intelect were contracted by PPG to provide two 3D as-built models of Unit 1 and Unit 2.

The model was developed using point-cloud data captured via our Faro Focus 3D S70 Laser Scanner. Each unit of the factory was scanned over a period of four days including the external building which we provided the client with a hard copy of all scan data for future use.

The 3D models were then manipulated to provide 2D plans and elevations ensuring all new equipment and machinery fit within the working areas. We then introduced our pipework division to produce P&ID’s based on new layouts.

All machinery and equipment were provided via external customers, these included Dromont, Packland, Devree, Cimaco-solutions and more. This helped us achieve the best possible outcome to improve PPG’s current production rate.

Project Information

Project: Feasibility Study
Client: PPG Architectural Coatings UK Ltd
Sector: Paints, Coatings and Materials
Discipline: Point-cloud and 3D Modelling
Value: Various