NWL Consett STW Works upgrade

Client: Carillion
Date: June 2011 – Nov 2011
Discipline: Mechanical and Electrical Design and Installation
Value: £400,000

Intelect UK Ltd were contracted by Carillion to undertake the electrical design, Installation & commissioning of a new LV distribution system, new tertiary works and the upgrade of the existing inlet works. Additionally Intelect mechanical department fabricated & installed new pipe works within the existing sludge & top water pumping station.

Intelect came in late to this project as the original contractor was unable to undertake and complete the design to required timeframe and standards. Following contract award Intelect undertook the design and completed the installation within the revised timeframe. Although the project was to a very tight schedule the work was completed to the highest standard and within time and budget, and to the satisfaction of NWL, Carillion and AMEC. This has subsequently led to an increase in our design output.

The project was Intelect’s first NWL electrical design project. Due to the circumstances the project became high profile to NWL.

Posted in Case Studies, News and tagged , , .